Creating functional and attractive spaces for the entire workforce
TCi has supplied and installed office and welfare furniture to many of the UK’s most notable construction & infrastructure developments – including Europe’s largest construction site!
Below is a small selection from the thousands of projects TCi has delivered successfully over the past decade or so. From vast installations at Hinkley Point C Nuclear New Build and Birmingham 2022 Commonwealth Games, through to small environmentally friendly office expansions and additional locker spaces, there are not many contractors and sites that haven’t engaged with TCi at some point!
Covid-19 has changed the way space is planned. TCi has worked closely with clients and suppliers to deliver safe environments. You can find out more about Covid-specific solutions HERE
- Worker accommodation complex, OxfordTCi furniture WORKS collaborated with Hill Partnership and the client to specify and install furniture across the 78 apartments. Ivy Lane is a collection of 6 new 3 and 5 storey apartment buildings consisting of… Read more: Worker accommodation complex, Oxford
- Modular building provider head office in Port TalbotThroughout this project, TCi collaborated closely with the client, Wernick Group, to ensure their ideas and vision were fulfilled, on time & budget. By engaging with diverse supply chain partners, TCi met exacting client specifications… Read more: Modular building provider head office in Port Talbot
- Premier furniture installation sets site accommodation standards at prestigious developmentMaximised value and space-saving was achieved by using a mesh-basket system, instead of traditional, individual mesh lockers.
- Practical style for major London developmentAn attractive range of standard and bespoke furniture products to suit the welcoming and modern surroundings.
- Skanska Costain STRABAG JV Site AccommodationThe scheme encompassed 12 London sites as part of the UK’s High Speed Two (HS2) infrastructure development, accommodating approximately 2500 staff
- Comfortable and attractive office facility for teamwork and productivityThe open-plan office environment is surrounded by collaborative space, meeting rooms and a central, full-height atrium. The offices benefit from natural light enhanced by the expansive use of glass to the front and rear of… Read more: Comfortable and attractive office facility for teamwork and productivity
- Bankside Yards project team officeMultiplex engaged TCi to provide a sustainable and Covid-secure workspace The main contractor is already well underway with the 130,000m2 development on Blackfriars Road, following the demolition of Ludgate House, which is to provide nine… Read more: Bankside Yards project team office
- Site furniture management scheme saves waste at former New Scotland YardThe project included the installation of office and welfare furniture, alongside the removal, and re-use of desks and chairs previously supplied via TCi’s furniture cycle asset management scheme
- Mesh basket system provides space solution on Canary Wharf siteTCi presented an answer to these problems using CAD space planning to offer a wire-mesh hanging basket system with standard changing benches. This provided:
- Chelsea Barracks, Phase 4 site accommodationMultiplex engaged TCi furniture WORKS to provide a site office for this flagship development with a sustainability solution Appointed to deliver phase 4 of the project boldly dubbed “The most coveted 12.8 acres in the… Read more: Chelsea Barracks, Phase 4 site accommodation
- Well appointed facilities at Commonwealth Games construction siteWorking closely with building supplier, Premier Modular, the layout was carefully space-planned to maximise available space whilst maintaining clear access routes and a comfortable atmosphere.
- West London Construction AcademyOne of the UK’s first, purpose-built construction academies has officially opened with the aim of tackling the UK’s building skills crisis and stopping the exodus of talent from the industry.
- Bouygues UK embraces sustainability with ECO360®The desks have been fully branded with the company logo applied to the desktop and panel-end legs, creating a completely customised, corporate workspace.
- Battersea Power Station Redevelopment – Phase 2A flexible working partnership was vital to the successful completion of the moves, with logistical and security constraints at play.
- Hinkley Campus – HOST 2 LtdBy undertaking the fit-out, furniture, fixings & equipment contract as one, TCi has been able to deliver a complete solution in time to allow the Hinkley Campus to become operational on schedule, with an extremely high standard of finish that you would expect from a campus facility at one of Europe’s largest developments.
- Fully recyclable “hot desks” for 2030 Hub LiverpoolAs an opportunity to embrace a number of the United Nations Sustainable Development Goals, 2030hub invited TCi to provide ECO360® fully recyclable desks to their office expansion, creating a universal hot-desk area.
- Ultra-modern WORKHUB for Braunton Parish Council facilityTCi worked with the council to create an effective scheme that would enable the building to reach its potential.
- EDF Energy Hinkley Point C site accommodation facilityAs tier 1 FF&E contractor to the Somerset nuclear power station site, TCi provides the FF&E (Furniture, Fixings & Equipment) The recently completed HAN (North facility) is the second of four accommodation blocks to be… Read more: EDF Energy Hinkley Point C site accommodation facility