Comprehensive FF&E setup for new prison site

Emphasis on durable, quality products to accommodate 1100 workers on the 5-year project

Reflecting the requirements of this £300m Ministry of Justice development, TCi furniture WORKS was chosen to provide a complete turnkey solution, from space planning through to installation, ensuring that site accommodation and welfare facilities meet both functional and aesthetic standards.

The 114-bay, three-storey modular building, serves as a central hub for more than 320 office workers, providing open-plan desk and meeting space, alongside changing rooms, lockers and canteen areas to facilitate up to 780 operatives.

The completed installation included:

Desks providing individual workspaces for site and office personnel
Wire-mesh locker spaces, providing secure personal storage for site workers
Meeting rooms equipped for collaboration and project planning
Boardrooms equipped for collaboration and project planning
Operatives served daily, in the canteen facility designed for efficient flow
Task chairs providing individual workspaces for site and office personnel

Challenge

Delivering a complete furniture and fit-out package for a live construction site of this scale came with several key challenges:

  • Coordinating with the client’s project programme to ensure the facility was ready for use ahead of mobilisation.
  • Providing durable, high-specification furniture capable of withstanding five years of intensive daily use where turnaround, maintenance, robustness and cost-efficiency are critical.
  • Managing the full installation across three floors and 114 modular units within a tight timescale in compliance with the client’s site access and safety protocols.
  • Creating a comfortable, modern workspace that promotes productivity and wellbeing for hundreds of operatives.

Our Approach

The in-house design team at TCi furniture WORKS carried out comprehensive space planning, optimising layouts for flow, comfort and usability across the modular building. Working closely with the client, we tailored every detail from desk configurations and breakout areas to bespoke reception furniture, to suit the client’s operational needs.

A team of nine, fully-qualified operatives completed the full installation in just 13 days, working in coordination with site management to meet the demanding schedule safely and efficiently.

Products were selected from our mid- to high-specification range, to ensure long-term durability, quality and comfort. Each item was chosen to perform reliably, while contributing to a professional and welcoming workspace for the project team.

Outcome

The completed facility provides the client with a fully functional, professional and comfortable environment that will support their workforce for the duration of the five-year build.

Key achievements include:

  • Rapid delivery: full installation completed in only 13 days by a nine-person team.
  • Quality & comfort: mid- to high-spec products created a comfortable, durable and productive workspace.
  • Efficiency: precise CAD planning and coordination ensured the project was handed over on schedule.
  • Tailored design: bespoke reception counter and layout planning were tailored to the client’s needs.

This project demonstrates TCi’sability to deliver large-scale, high-quality workspace solutions within complex construction environments. By combining detailed space planning, robust specification and rapid, coordinated installation, we created a durable and professional facility that enhances daily working life for hundreds of operatives.

Why This Project Stands Out:

It stands as a testament to our experience in delivering fit-for-purpose and long-life furniture installations that support major infrastructure projects across the UK.