Following the appointment of Mace Group at the iconic Battersea Power Station redevelopment, several large-scale office moves and installations have been undertaken by TCi furniture WORKS
The complex nature of the work meant that it had to be broken up into several phases to accommodate the volume of furniture and the client’s timescales. A flexible working partnership was vital to the successful completion of the moves, with logistical and security constraints at play. Due to the complexity and scale of the project, not everything went smoothly, but TCi maintained dialogue with the client to achieve all objectives.
- Mace
Building Supplier:
- Premier Modular Ltd
Installation/Operation:
- Jan 18 to date
Capacity:
- 600 Office Staff
- >2300 site operatives
Scope:
- Office furniture installation
- Wire mesh hanging basket welfare system
“Since joining mace we have moved circa 600 people 2 or 3 times to accommodate refurbishment of the offices and a final collaborative layout requested by our client. TCi have been instrumental in delivering both the moves and ensuring the furniture has been delivered and built to very tight timelines and restrictive circumstances (lifts breaking down etc). The management are very available to deal with last minute requests and I would fully recommend their services in the future.”
Peter Woods, Mace Macro – Senior FM