Premier furniture installation sets site accommodation standards at prestigious development
Maximised value and space-saving was achieved by using a mesh-basket system, instead of traditional, individual mesh lockers.
Maximised value and space-saving was achieved by using a mesh-basket system, instead of traditional, individual mesh lockers.
An attractive range of standard and bespoke furniture products to suit the welcoming and modern surroundings.
Practical style for major London development Read More »
The scheme encompassed 12 London sites as part of the UK’s High Speed Two (HS2) infrastructure development, accommodating approximately 2500 staff
Skanska Costain STRABAG JV Site Accommodation Read More »
The open-plan office environment is surrounded by collaborative space, meeting rooms and a central, full-height atrium. The offices benefit from natural light enhanced by the expansive use of glass to the front and rear of the building, coupled with glass interior partitions. The first floor is accessed by a staircase with natural wood décor features
Comfortable and attractive office facility for teamwork and productivity Read More »
Multiplex engaged TCi to provide a sustainable and Covid-secure workspace The main contractor is already well underway with the 130,000m2 development on Blackfriars Road, following the demolition of Ludgate House, which is to provide nine buildings including a 53 storey tower. When complete, it will comprise 341 new homes, cultural and workspace, public space and
Bankside Yards project team office Read More »
The project included the installation of office and welfare furniture, alongside the removal, and re-use of desks and chairs previously supplied via TCi’s furniture cycle asset management scheme
Site furniture management scheme saves waste at former New Scotland Yard Read More »
TCi presented an answer to these problems using CAD space planning to offer a wire-mesh hanging basket system with standard changing benches. This provided:
Mesh basket system provides space solution on Canary Wharf site Read More »
Multiplex engaged TCi furniture WORKS to provide a site office for this flagship development with a sustainability solution Appointed to deliver phase 4 of the project boldly dubbed “The most coveted 12.8 acres in the world,” main contractor Multiplex needed to accommodate 500 site workers and 128 office staff. The challenge was to create a
Chelsea Barracks, Phase 4 site accommodation Read More »
Working closely with building supplier, Premier Modular, the layout was carefully space-planned to maximise available space whilst maintaining clear access routes and a comfortable atmosphere.
Well appointed facilities at Commonwealth Games construction site Read More »
One of the UK’s first, purpose-built construction academies has officially opened with the aim of tackling the UK’s building skills crisis and stopping the exodus of talent from the industry.
West London Construction Academy Read More »